Subsea manifolds from above at the Dales yard

Home/Past Projects

Past Projects

From complex 200Te+ subsea control manifolds down to simple one-off components.

Seagreen Barge Grillage OutfittingsOffshore wind

Seagreen Barge Grillage Outfittings

Fabrication and complex seafastening of grillages for the installation of offshore wind turbine jackets. Total weight over 600Te per barge.

Fabrication & seafastening

PUS Structure RefurbOffshore

PUS Structure Refurb

Fabrication and refurbishment, inclusive of rotating frame (worked on at quayside), longitudinal & transversal skidding tracks & cradles.

Fabrication & refurbishment

Clevis Tensioning SystemSubsea

Clevis Tensioning System

Fabrication of 8 No. clevis tensioners with hydraulic cylinders & radius protection fairings.

Fabrication

Storage Tank and SpoolsProcess

Storage Tank and Spools

Fabricate, test and coat 4x holding tanks for brine and oil storage, along with saddles and associated pipework.

Fabricate, test & coat

4″ Piping ScopePipework

4″ Piping Scope

Successfully fabricated, coated and delivered these drain spools and supports to an extremely tight deadline.

Fabricate, coat & deliver

100+Te Subsea ManifoldsSubsea oil & gas

100+Te Subsea Manifolds

Fabrication of 3 subsea manifolds. We successfully delivered these 100+ tonne structures to the quayside concurrently, without any lost time safety incidents or welding repairs.

Fabrication

Diesel Tank Shipping FramesOffshore

Diesel Tank Shipping Frames

Fabricate 2x tank shipping frames. Fit out and trial lifts on site prior to load out.

Fabrication & trial lifts

EPRS Welding HabitatSubsea

EPRS Welding Habitat

Fabricate, test, coat and site integrity testing of divers’ habitat and deployment equipment.

Fabricate, test & coat

150m Gas Main Fabrication & InstallationOnshore

150m Gas Main Fabrication & Installation

Partial offsite fabrication of new 6” gas main. Onsite installation, welding, testing and coating of 150m main located on the underside of Fochabers Road Bridge.

Fabrication & installation

150Te Tensioner BuildOffshore

150Te Tensioner Build

The build consisted of the following: base frame, 2 x upper segments, 2 x lower segments. Total weight of the unit 34Te. All electrical and hydraulic brackets were fitted on site, which allowed the unit to go direct to coating, saving time & costs to the client.

Build

Reels & Saddle FramesOffshore

Reels & Saddle Frames

Fabrication of 4x reel & saddle frame sets.

Fabrication

Gas Injection Project ChadInternational oil & gas

Gas Injection Project Chad

Fabrication, sea freight packaging and installation support on more than 100,000kg of structural steel. Fabricated in 650+ individual components, allowing it to be shipped from the UK to Chad for successful installation.

Fabrication & installation support

15m x 12m 140Te Gas Export PLEM StructureSubsea oil & gas

15m x 12m 140Te Gas Export PLEM Structure

Complete build, coat, outfit and test of gas export PLEM structure c/w 10” diameter tie-in spools.

Build, coat, outfit & test

Horizontal Pipe Lay SystemOffshore

Horizontal Pipe Lay System

Complete build and installation onto vessel of horizontal lay system and ancillary equipment.

Build & installation

150Te Valve Skid StructureSubsea

150Te Valve Skid Structure

Complete build, test and delivery to vessel of valve skid & tie-in spools.

Build, test & delivery

Subsea 8” Pipeline & Valve Protection StructureSubsea

Subsea 8” Pipeline & Valve Protection Structure

Fabricate, coat and test 8” replacement pipeline & valve protection structure.

Fabricate, coat & test

8Te Boat Landing LadderDecommissioning

8Te Boat Landing Ladder

Complete fabrication of 14m long ladder structure with grouting & friction clamps. Walkway structure also fabricated to tie in to existing deck structure. For decommissioning project.

Fabrication

Chemical Mixing Plant & Wash StationsOnshore process

Chemical Mixing Plant & Wash Stations

Design support, fabrication & installation of more than 40Te of structural steel and in excess of 7km of piping, the majority stainless steel 316L. This was achieved with No Onsite Welding (NOW).

Design, fabrication & installation

Emergency Scour Gate RefurbHydro

Emergency Scour Gate Refurb

Remove, refurbish & reinstall roller gate, ropes, pulleys and rope drums. Install new hydraulic gearbox drive motor.

Refurbishment

Dispersal Valve RefurbHydro

Dispersal Valve Refurb

Dispersal valve & drain valve removal, refurbishment & replacement. Compensation valve removal & replacement. Blasting, painting & NDT of scour pipe. Offsite and onsite testing / commissioning.

Refurbishment & commissioning

Intake Screens & Screen Cleaner ReplacementHydro

Intake Screens & Screen Cleaner Replacement

Removal of existing and installation of new intake structure and stoplogs. Installation of new automatic screen cleaning system. Testing and commissioning of refurbished struts.

Removal & installation

Drum Gate Strut Gear RefurbHydro

Drum Gate Strut Gear Refurb

Manufacture sub-frame to support 157 ton drum gate. Installation of support frame and jacking system. Dismantle and refurbishment of strutting system. Testing & commissioning.

Refurbishment

24” Pipeline ReplacementSubsea

24” Pipeline Replacement

24” diameter concrete-coated tie-in spools, fabricated from 1” thick high strength carbon steel.

Fabrication

65 Metre 42″ Riser CaissonOffshore

65 Metre 42″ Riser Caisson

Complete build, test and delivery to vessel of 42″ riser caisson & hang-off clamps.

Build, test & delivery

FPSO Refurbishment ProjectOffshore

FPSO Refurbishment Project

Pipework fabrication: 20″ IGG header pipework, vacuum seal pipes, various 12”/6” spools. Structural items: pipe clamps, grating panels, runway beams & helideck frames.

Pipework & structural

Aerial view of the Dales Industrial Estate in Peterhead

+ Get in touch

Specialist Engineering and Fabrication Solutions to the Offshore and Onshore Sectors